1. Fiabilis – Drogenbos
Description of works
- Disassembly and complete removal of the former setup
- New GYPROC partitions
- Full-height glazed partitions with laminated glass 66.2
- Full-height glazed doors
- Supply and fitting of a mineral fibre tile suspended ceiling
- Floor covering with carpet tiles and vinyl tiles
- Electricity: electrical network, data, lighting
- Painting
- Complete planning of a shower area
- New kitchen
- Complete revision of windows (maintenance)
- Storage
- Bringing up to comply with fire standards, according to the current standards
- Access control and alarm
2. Jonfosse Swimming Pool – Liège
The people of Liège will, at last, have a public swimming pool in the very heart of their city. The communal Jonfosse swimming pool was opened on 18 January. This brand new infrastructure succeeds The Bains de la Sauvenière, which closed in 2000 for safety reasons. 3 years of works and 16 million euros of public investment were required for this.
Description of works
- Rockfon acoustic blocks to the right of the swimming pool, 9 elements of 60 tiles – 388.80m²
- Perforated Siniat LaCoustic acoustic suspended ceiling 12/25R – 101m²
- Rockfon Pallas suspended ceiling – 660m²
- Rockfon Royal suspended ceiling – 504m²
- Rockfon Charcoal suspended ceiling – 150m²
- MS100A partitions – 620m²