{"id":1304,"date":"2020-03-01T10:12:48","date_gmt":"2020-03-01T09:12:48","guid":{"rendered":"https:\/\/europlafond.uni-vert.be\/?p=1304"},"modified":"2022-03-16T13:41:37","modified_gmt":"2022-03-16T12:41:37","slug":"fiabilis-jonfosse-swimming-pool","status":"publish","type":"post","link":"https:\/\/www.europlafond.be\/en\/fiabilis-jonfosse-swimming-pool\/","title":{"rendered":"Fiabilis & Jonfosse Swimming Pool"},"content":{"rendered":"
[vc_row padding_top_multiplier=”” padding_bottom_multiplier=””][vc_column]
December 2019<\/p><\/div><\/div>
Mid-March 2020<\/p><\/div><\/div>
Planning of an office area & bringing up to fire standards.
\nWorks carried out with the aim of having the best natural light as possible.<\/p><\/div><\/div>
[\/vc_column_text]
Start of May 2019<\/p><\/div><\/div>
Start of January 2020<\/p><\/div><\/div>
The Jonfosse Swimming Pool project was entrusted to us by SASPJ BPC and Gilles Moury SA to install partitions and mineral fibre tile suspended ceilings and acoustic baffles above the pool.<\/p><\/div><\/div>
[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"
Europlafond is finishing 2 sites at this start of 2020: the planning of the office area of Fiabilis in Drogenbos and the Jonfosse swimming pool project in Li\u00e8ge.<\/p>\n","protected":false},"author":3,"featured_media":746,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[2],"tags":[59,58,64,152,119],"class_list":["post-1304","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-europlafond-news","tag-electricity","tag-europlafond-en","tag-planning-offices","tag-swimming-pool","tag-works","post_format-post-format-gallery"],"yoast_head":"\n